Door, frame and hardware submittals, checked opening by opening
We prepare Division 08 submittals for door and glazing contractors and suppliers: hollow metal and wood doors, frames, hardware schedules, storefront, glazing and access doors. Every opening is reconciled with the door schedule, fire ratings and hardware sets.
Division 08 submittals we prepare
Openings are where small errors multiply: one wrong hand or fire rating repeats across dozens of doors. We reconcile every opening number against the architectural door schedule, so the doors, frames and hardware all describe the same opening.
08 11 13
Hollow metal doors & frames
Door and frame elevations, profiles, gauges, anchors, hardware preparations and fire labels, with an opening-by-opening schedule.
08 14 16 / 08 14 33
Wood doors
Door construction, cores, faces and veneer matching, factory finishing, and fire and acoustic ratings by opening.
08 71 00
Door hardware
Hardware sets in the industry-standard schedule format, product data for every item, finishes, keying and electrified hardware wiring diagrams.
08 41 13 / 08 44 13
Storefront & curtain wall
Elevations, sections, anchorage, thermal data and glass types, with delegated-design calculations where required.
08 80 00 / 08 88 13
Glazing & fire-rated glazing
Glass types, makeups and performance data by opening, plus fire-rated glazing listings and labels.
08 31 13 / 08 33 00
Access doors & coiling doors
Sizes, ratings, finishes and locations for access panels, and operator and wiring data for coiling and sectional doors.
Section numbers follow CSI MasterFormat. Your project manual always governs: we build each package from its own Part 1 submittal requirements. Need another section? See the full CSI divisions list.
Every package we deliver includes
- Transmittal cover sheet for every package, numbered by spec section and revision
- Bookmarked, indexed PDF so reviewers can jump straight to each item
- Line-by-line spec check against Part 2 (products) and the Part 1 submittal article
- Marked-up product data: the exact model, size, options and accessories highlighted
- Deviations listed up front, never buried, with the reason for each
- RFI drafts when the drawings and specs conflict, instead of guessing
- Resubmittals that answer every reviewer comment, one by one
Why Division 08 submittals get sent back
- Door hands, sizes or fire ratings that don't match the door schedule
- Hardware sets that don't suit the door and frame preparations
- Fire-rated openings with non-listed hardware or glazing
- Missing keying schedule or electrified hardware wiring diagrams
- Finishes that don't match the specified finish designation
- Storefront submitted without the anchorage or delegated-design calculations
More on this: common reasons submittals get rejected.
How it works
01
Send the documents
Spec sections, drawings, addenda, and any products you've already bought or prefer.
02
Get a flat quote
One number per package within 48–72 hours. No subscriptions or retainers.
03
We build and check
Product selection, mark-ups and drawings, checked line by line against the spec.
04
You submit
A GC-ready PDF under your company name, plus help with any reviewer comments.
Frequently asked questions
Do you write hardware schedules?
We organize door hardware submittals around your supplier's hardware sets, check each set against the specification and door schedule, and assemble the product data, finishes and keying information into a complete package. Tell us if you need the hardware sets themselves written from the specification.
Can you reconcile doors, frames and hardware across suppliers?
Yes. When doors, frames and hardware come from different suppliers, we check that preparations, hands, sizes and ratings agree for every opening before anything is submitted.
Do fire-rated openings need anything special?
Yes. Each component in a fire-rated opening must be listed for the rating, including the door, frame, hardware and any glazing. We mark the labels and listings so the reviewer can confirm the complete assembly.
How do you price Division 08 submittals?
As a flat quote per package based on the number of openings and sections involved, sent within 48 to 72 hours.
Send us your spec book. Get a flat quote in 48–72 hours.
No account, no software and no retainer. Tell us the sections you need and we price exactly that.